Ship Unloader F1000 project
05/12/2025
Following the successful execution of the Ship Unloader M800 project, PPL has continued to deliver excellence with the transport and site-move of the Ship Unloader F1000. The 310-ton unit was safely and precisely relocated from the fabrication yard to the designated receiving area at PTSC Phu My Port.
Quick view
The project’s success was driven by a combination of advanced technical capabilities, standardized operational procedures, and a highly skilled engineering team. Equipped with specialized heavy-duty machinery, meticulously engineered transport plans, and the dedication of our on-site crew, PPL executed the operation in full compliance with technical requirements, ensuring absolute safety and on-schedule completion.

Comments