Tai Tam Wind Power Project

10/10/2021

TAI TAM WIND POWER PLANT

  • Owner : Tai Tam Quang Tri Energy Investment Company Limited
  • PPL’s scope: Transportation service
  • The total project cargo: 12 turbines
  • The weight of heaviest package: 86,9 tons
  • The lengthest package: 70 m
  • Transport distance: 245 km
    (From on La seaport to site)
  • Project time duration: From September 2021 to October 2021
Quick view
With strict requirements on the transportation schedule of the investor, Precious Prestige Trading and Logistics One Member Company Limited (PPL) has successfully transported 12 wind power towers over a distance of 240 km from Hon La Port (Quang Binh) to the construction site. To achieve that goal, PPL has established a project team with 60 executive staff, direct production at the construction site and 15 convoys of equipment imported from Euro such as Germany, Italy, with more than 90% of new equipment, which transport 12 turbines that are super-heavy equipment to the construction site safely.

In particular, the project was carried out with the typical rainy and stormy weather of the Central region, but PPL was determined to complete the transportation within 28 days.

 