Kom Tum Wind Power Project
26/10/2021
TAN TAN NHAT - DAK GLEI WIND POWER PLANT
- Owner: Tan Tan Nhat, jsc
- EPC: China Energy Engineering Group Anhui
- PPL’s partner : CMEC Comtrans
- PPL’s scope: Transportation
- The total project cargo: 18 turbines
- The weight of heaviest package: 114 tons
- The lengthest package: 76.5 m
- Transport distance: 1058 km
(From Phu My seaport to site: 722 km
From Quy Nhon seaport to site: 336 km) - Project time duration: From June 2021
Quick view
With a wealth of experience in the transportation of super-heavy cargo, close relationships with seaports and especially with a system of modern and diversified specialized means of transport that meet the world's shipping standards, Precious Prestige Trading and Logistics One Member Company Limited (PPL) has been meeting the requirements of transporting all equipment of the project.