Dak Lak Wind Power Project

27/10/2021
CU NE 1 - 2 WIND POWER PLANT
KRONG BUK 1 - 2 WIND POWER PLANT
  • Owner: Cu Ne Renewable Energy Investment Co., Ltd
                  KrongBuk New Energy Investment Co., Ltd
  • EPC: China Huadian Co., Ltd
  • PPL’s partner: CMEC Comtrans
  • PPL’s scope: Transportation, customs clearance service
  • The total project cargo: 73 turbines
  • The weight of heaviest package: 86,9 tons
  • The longgest package: 77 m
  • Transport distance: 747 km
    (From Phu My seaport to site: 455 km
    From Cam Ranh seaport to site: 292 km)
  • Project time duration: From April 2021
Quick view
Wind power projects are in the process of receding on schedule, so the investor's equipment transport time requirements are very strict, plus the rainy weather conditions and difficult terrain during the illness outbreaks of lockdown, which are difficulties for partners carrying out transportation. But with the potential of vehicles, transportation equipment and the determination of the entire Dak Lak project board and the acumen management of the Precious Prestige Trading and Logistics One Member Company Limited (PPL)'s Directors Board, all wind power equipment of the project has been transported successfully, safely and on schedule. 

 