HUONG LINH 3 - 4 WIND POWER PLANT
  • Owner: Huong Linh 3 Wind Power., Jsc
                 Huong Linh 4 Wind Power., Jsc
  • PPL’s partner: Rongtua corp
  • PPL’s scope: Transportation and customs clearance service
  • The total project cargo: 19 turbines
  • The weight of heaviest package: 87,7 tons
  • The lengthest package: 70 m
  • Transport distance: 202 km
    (From Hon La seaport to site)
  • Project time duration: From May 2021
Quick view
Huong Linh 3 - 4 wind power plant was put into construction and exploitation in order to operate to serve the electricity network for the whole region, reduce the load on the national power grid, contributing to meeting the electricity demand of the people and exploit the potential of economic efficiency, create new impetus for economic development, hunger eradication and poverty reduction in the mountainous district of Huong Hoa and contribute to the socio - economic development of Quang Tri province.

Wind power equipment is super-heavy, overloaded goods, and especially there are equipment that must use specialized means of transport to meet the requirements of safe transportation and terrain moving from the port. The project is very long and arduous. With a wealth of experience in the transportation of super-heavy goods, close relationships with seaports and especially with the system of vehicles and transport equipment, 90% are imported to meet international shipping standards. Precious Prestige Trading and Logistics One Member Company Limited (PPL) has become a reliable partner to transport wind power equipment for Huong Linh 3 - 4 project, in addition, PPL also built its own storage yard for project to ensure time as well as safety in transportation, this is very few shipping enterprises have the ability to invest in the project.