Bao Tin Trading and Company Limited - PPL has completed the preparation items, ready to move the QC08 crane to the landing position on schedule.
 
Quick view
During the process of taking the crane for maintenance and periodic inspection, transporting hundreds of hundreds of tons of cranes requires specialized equipment SPMT to move safely.
 

Photo: Hundreds of tons of cranes are about to be moved.

The work needs to be done in the following steps:
  • Measure and shoot coordinates at the storage yard            
  • Reinforcing and reinforcing steel structure with damaged legs of the crane
  • Proceeding as a storage platform in the temporary yard.            
  • Assemble the trailers according to their configuration and install the girder systems on the trailers at the yard.            
  • Dismantling the obstacles on the road to move the crane from the jetty operator to position fix at dumps            
  • Jacks and remove foot crane            
  • dam slope wharf and lined plate            
  • Remove the obstacles on cranes to have space for the trailer to
  • Give trailer into position under the main girder of the cranecrane    
  • Increase thetie-down with the trailer
  • Carry out a test lifting of the crane before transporting            
Each job is performed precisely by experts of PPL, ensuring absolute safety. 
 
Photo: Installing the trailer in place


 
Moving 2 trailer groups under the main girder of QC08 crane is controlled by experts with specialized equipment, accurate to every centimeter. After that, we will insert wood into positions to ensure wheel balance, increase the lashing of the bridge with the trailer and test lift the crane to ensure safety and correct technique before moving.