Ship Unloader CP400

web-cp400-2

Goals & Scope of Work

PPL participated in providing site-move services for the Ship Unloader CP400 project at PTSC Phu My Port, supporting the receiving and installation of large-scale bulk cargo handling equipment.

 

The scope of work included transportation of oversized and heavy Ship Unloader structures from the laydown area to the installation position within the port, with the heaviest cargo weighing up to 312 tons.

 

The project required specialized transportation methods, strict control of load distribution and structural stability, as well as close coordination between operations, engineering and site teams to ensure project safety and schedule compliance.

Key Challenges

  • Transportation of oversized Ship Unloader structures weighing up to 312 tons
  • Working conditions within an active port area requiring strict safety control
  • High precision requirements during equipment transportation and positioning operations
  • Limited operating space for transportation equipment coordination within the port area
  • Tight project schedule requiring continuous coordination between engineering and operations teams

Solutions & Deployment

  • Implemented site-move methods based on detailed engineering calculations and site surveys
  • Mobilized SPMT systems and specialized transport equipment suitable for heavy cargo operations
  • Closely monitored load distribution, center of gravity and structural stability throughout the transportation process
  • Maintained close coordination between operations, engineering and site teams to ensure project safety and schedule compliance
  • Executed transportation and equipment positioning in accordance with project technical requirements

     

Project Overview

Investor

Neuero

Client

PTSC Phu My Port Joint Stock Company (PTSC Phu My)

Scope of work

Site-move

Weight (MT)

312 T

Place of execution

PTSC Phu My Port

Execution period

March 2026

Notice