Sitemove QC08 Crane

18

Goals & Scope of Work

  • Relocation and transportation of the QC08 crane at Tan Vu Port, Hai Phong
  • Execution of site-move operations supporting port handling capacity enhancement
  • Utilized SPMT/trailer systems for oversized and heavy equipment transportation
  • Ensured safe movement within an active container port environment

Key Challenges

  • The quay crane weighed up to 650 MT, requiring strict stability control
  • Limited operating space within the port area affected equipment coordination
  • Movement operations required handling obstacles and actual ground conditions
  • Synchronization required between SPMT systems, lifting methods and site operations
  • Maintaining safety during transportation within an active container terminal

Solutions & Deployment

  • Mobilized dedicated SPMT/trailer systems suitable for heavy crane transportation
  • Reinforced crane supports and prepared transport routes prior to execution
  • Applied load securing, support and load control measures throughout transportation
  • Removed obstacles and optimized movement routes within the port area
  • Ensured close coordination between engineering, operations and site teams to maintain safety and schedule

Project Overview

Client

Port of Hai Phong JSC

Scope of work

Site-move

Comodity

1 Unit of QC08 gantry crane

Weight (MT)

650 tons

Execution time

December 2021

Place of execution

Tan Vu Port (Hai Phong)