Sitemove QC08 Crane
Goals & Scope of Work
- Relocation and transportation of the QC08 crane at Tan Vu Port, Hai Phong
- Execution of site-move operations supporting port handling capacity enhancement
- Utilized SPMT/trailer systems for oversized and heavy equipment transportation
- Ensured safe movement within an active container port environment
Key Challenges
- The quay crane weighed up to 650 MT, requiring strict stability control
- Limited operating space within the port area affected equipment coordination
- Movement operations required handling obstacles and actual ground conditions
- Synchronization required between SPMT systems, lifting methods and site operations
- Maintaining safety during transportation within an active container terminal
Solutions & Deployment
- Mobilized dedicated SPMT/trailer systems suitable for heavy crane transportation
- Reinforced crane supports and prepared transport routes prior to execution
- Applied load securing, support and load control measures throughout transportation
- Removed obstacles and optimized movement routes within the port area
- Ensured close coordination between engineering, operations and site teams to maintain safety and schedule
Project Overview
Client
Port of Hai Phong JSC
Scope of work
Site-move
Comodity
1 Unit of QC08 gantry crane
Weight (MT)
650 tons
Execution time
December 2021
Place of execution
Tan Vu Port (Hai Phong)