Ship Unloader F800
Goals & Scope of Work
PPL continued to execute site-move services for the Ship Unloader F800 project at PTSC Phu My Port, part of a bulk handling equipment project series.
The scope of work included transportation and positioning of oversized Ship Unloader structures within the port area for equipment installation and completion works. With the heaviest package reaching 312 tons, the project required precise transport planning, strict load control and close coordination between technical, operation and site teams.
Being continuously entrusted with multiple Ship Unloader projects at PTSC Phu My Port demonstrates PPL’s execution capability and experience in heavy cargo logistics for port and industrial sectors.
Key Challenges
- Handling oversized and heavy Ship Unloader structures within the port area
- Strict control requirements for load distribution, stability and operational safety
- Limited operating space within active port installation areas
- Continuous coordination between technical, operation and site teams to maintain project progress
- Maintaining safety under continuous port operation conditions
Solutions & Deployment
- Executed the site-move plan based on detailed site surveys and engineering calculations
- Mobilized SPMT systems and specialized equipment suitable for the cargo weight
- Closely monitored load distribution, center of gravity and stability throughout transportation
- Coordinated technical, operation and site teams to ensure safety and project schedule
- Performed cargo positioning in accordance with project technical requirements
Project Overview
Investor
Neuero
Client
PTSC Phu My Port Joint Stock Company (PTSC Phu My)
Scope of work
Site-move
Weight (MT)
312 T
Place of execution
PTSC Phu My Port
Execution period
May 2026