Nong Cong Transformer (Thanh Hoa)
Goals & Scope of Work
Performed receiving, handling and transportation services for the transformer serving the 220kV Nong Cong Substation Project, Thanh Hoa
Transported equipment from Dong Anh Electrical Equipment Corporation (EEMC) to the project site
Implemented specialized transportation solutions for oversized and heavy electrical equipment
Ensured safety and schedule throughout the cargo handling and transportation process
Key Challenges
The transformer had heavy weight and oversized dimensions, requiring strict transportation control
Handling and lifting operations required high precision and safety standards
The road transport route required detailed survey and planning to ensure infrastructure safety
Coordination was required between transport vehicles, lifting equipment and site operation teams
Delivery schedule needed to support substation energization and commissioning activities
Solutions & Deployment
Mobilized dedicated trailer systems suitable for transformer dimensions and weight
Applied handling and lashing methods to ensure cargo stability during transportation
Conducted route survey and transport optimization to ensure operational safety
Controlled technical factors such as load distribution, center of gravity and transport clearance
Ensured close coordination between engineering, operations and site teams to maintain project safety and schedule
Project Overview
Client
Dong Anh Electrical Equipment Corporation (EEMC)
Scope of work
Receiving, loading, unloading, and transportation
Package information
250MVA-220kV Transformer; No: 244839-200, oil tanks and all accessories
Weight (MT)
Transformer body (without oil): 117.5 tons; Transformer oil: 52 tons; Transformer accessories: 21.3 tons
Transformer Transport Dimensions (L × W × H)
8,950 × 3,500 × 4,150 mm
Transport route
From Dong Anh Electrical Equipment Corporation to Nong Cong 220kV Substation, Thanh Hoa Province