Barossa FPSO (Shipment 2)

The Barossa - Singapore Phase 2 project is being undertaken by PPL. The project will take place from February 23, 2023 to March 1, 2023.

du-an-barossa-singapore-shipment-2-10

Goals & Scope of Work

  • Transport and load-out of structures serving the CO₂ processing system
  • Route: Vina-Offshore → Dong Xuyen Port
  • Movement using trailers/SPMT with lifting support
  • Load-out onto barge for international marine transport

Key Challenges

  • Heavy equipment requiring strict stability and balance control during movement
  • Coordination between two port locations under continuous execution conditions
  • High precision required during load-out operations
  • Synchronization between SPMT – lifting – barge throughout execution
  • Impact from tidal conditions and quay operations

Solutions & Deployment

  • Used SPMT/trailer systems suitable for heavy cargo
  • Applied lifting support for safe movement and accurate positioning
  • Executed load-out based on tidal windows
  • Controlled key factors such as center of gravity, tilt and load distribution
  • Ensured coordination between engineering, operations and site teams to maintain safety and schedule

Project Overview

Client

Bolloré Logistics Vietnam

Scope of work

Site-move, load-out

Comodity

2 skids of CO2 Removal Packages: 6702A & 6702B

Weight (MT)

250-357 tons

Place of execution

Vina-Offshore Port & Dong Xuyen Port

Execution time

23/02/2023 - 01/03/2023